Introduction:

D(TD)-Type vertical   is composed by moving parts (hopper and traction tape), with the upper section of the drive roller, with the lower section of the idler pulley, intermediate casing, driving device, non-return brake, etc.

Features:

1. This bucket elevator is characterized by rapid centrifugal discharge

2. The rubber conveyor is used as a traction component (), so it is not suitable for conveying large pieces of materials with high grinding and cutting resistance.

3. The temperature of the material transported shall not exceed 60 ° c.  150 ° c is allowed if the heat-resistant rubber belt is used.

4. The bucket elevator capacity is 3.1~66 cubic meters per hour and the height is 4~30 meters.

Applications:

suitable for the upward transportation: small and loose powder, granular materials such as coal, sand, dust coke, cement, mineral water, etc.

manufacturing and installation methods:

In order to meet various requirements, the bucket elevator has a variety of manufacturing and installation methods.

1. According to the shape of hopper, it is divided into two types

S method — with deep garden bottom hopper

Q method — with shallow garden bottom hopper

2. There are two types of discharge ports in the upper section

X1 method — discharge port with inclined flange

X2 method — discharge port with horizontal flange

3. According to the lower section of the form of the feed port, it is divided into two

J1 method — the inclined plane of the feed inlet forms a 45 Angle with the horizontal plane

J2 method — the inclined plane of the feed inlet forms a 60 Angle with the horizontal plane

4. According to the position of the side inspection door in the middle housing, it is divided into four types

K1 method — middle housing side with lower left inspection door

K2 method — middle housing side with lower right inspection door

K3 process – middle housing side with upper left inspection door

K4 process – middle housing side with upper right inspection door

5. According to the position of the inspection door on the end face of the middle housing, it is divided into two types

Z1 method — middle housing end face with bottom inspection door

Z2 method — middle housing end face with upper inspection door

6. According to the transmission of the relative position of the elevator, it is divided into two

Left – the drive is on the left

Right – the drive is on the right

Project

Hoist Type

D160

D250

D350

D450

S Making Method

〇 Making Method

S Making Method

〇 Making Method

S Making Method

〇 Making Method

S Making Method

Q Making Method

Transport Capacity(m³/h )

8

3.1

21.6

11.8

42

25

69.5

48

Hopper Capacity(L )

1.1

0.65

3.2

2.6

7.8

7

15

14.5

Bucket Pitch(mm )

300

300

400

400

500

500

640

640

Tape Weight With Hopper(kg/m )

4.72

8.8

10.2

9.4

12.1

12.1

21.3

21.3

Conveyor Tape: width(mm)

200

300

400

500

Conveyor Tape: number of layers

4

4

5

5

Hopper Speed(m/s )

1

1.25

1.25

1.25

Rotation Of Transmission Drum Shaft(r/min )

47.5

47.5

47.5

37.5

Maximum Bulk Of Material(mm)

25

35

45

55